Lincolnshire is not an old town on paper. The village was incorporated on August 5, 1957, out of the unincorporated Half Day area, after land was bought for a residential subdivision. Its fastest growth came later, from 1983 through the 1990s. So 'older' here means the houses from the first decades, and anything that stood in the Half Day area before the village existed.
Those walls can behave differently from a 1990s wall. Know this going in.
Half Day before the subdivision
Accounts of the village's founding describe a rough start: the first subdivision had dirt roads and lacked a proper sanitation system and gas line, problems that pushed residents to incorporate. Houses from that era were built to the standards of their time, and many have been added on to, rewired and refinished along the way. Inside one house, you may find walls from three different decades.
What is behind the paint
Plaster on lath
Houses built before drywall became standard used plaster troweled over wooden lath strips or expanded metal. Plaster is harder and thicker than board. Cracks in it often follow the lath, and loose areas sound hollow when tapped. Repairs reattach loose plaster with screws and plaster washers, then fill and skim. Patching plaster with drywall works, but the board has to be packed out with shims to plaster depth.
Thinner board
Some older sheets run thinner than current wall board. A patch cut from modern stock will sit proud. The fix is a matching thickness or shims behind the old edge, so the face lines up before tape goes on.
Early gypsum board
Mid-century board has the same gypsum core in a paper face, but nails, not screws, were common for hanging it, and the joints were finished by hand with whatever compound the finisher preferred. Nailed board pops more readily as framing dries. When a section is opened, the old nails near the edge are often reset or swapped for screws, so the patch meets a firm edge instead of a loose one.
Many layers of paint
Decades of paint can hide old repairs and soften texture. A patch next to a heavily painted wall can look too crisp. Feathering wider and matching the sheen helps it blend.
Test old compound before sanding
Federal rules ban consumer patching compounds with added asbestos, and the rule names drywall spackling and tape joint compound among them. In a house finished before that ban, the original joint compound or a sprayed ceiling texture may contain it. Sanding or scraping is what puts fibers in the air. Send a small sample out for lab testing first, ahead of any disturbance. If it comes back positive, that section goes to an abatement contractor first.
Settling, shrinkage and old cracks
Older houses have finished most of their early settling. Cracks in them are more often seasonal: lumber shrinking in the dry heating months and swelling in humid summers. That is the same movement behind nail pops in newer houses. A crack that widens month to month, angles hard off a door corner and travels with sticking doors is different. Get an engineer's opinion on that one before patching.
Hairline cracks in older walls are worth cutting into a shallow V, filling with setting compound and taping. Mud alone over a moving crack tends to reopen.
Planning the repair
- Note when the house was built and when walls were last redone, if you know.
- Tap the wall around the damage. Hollow means plaster that has let go.
- Look at a switch plate edge to see how thick the wall is.
- Ask whether the old compound should be tested before sanding.
- Expect extra coats and longer drying than newer board needs.
For the cracks and popped fasteners common in later houses, see the page on popped screws and split seams. For holes from a kitchen or bath update, the page on patching holes after a remodel covers the steps.